Eskom takes control of City of Ekurhuleni's load shedding

26 Jul 2023

Eskom said numerous talks with the City of Ekurhuleni around not complying with national rolling power cuts schedule have been unsuccessful.

Ekurhuleni - Figure 1
Photo Eyewitness News

FILE: The utility's Amanda Qithi explained that failure to implement load shedding by municipalities affected the stability of the national grid. Picture: sudiptabhowmick/123rf.com

JOHANNESBURG - Eskom has taken over load shedding in the City of Ekurhuleni.

The power utility said the metro has not been complying with implementing the rolling power cuts as required.

Eskom said it has had numerous discussions with the City of Ekurhuleni on the matter, but there has been no improvement.

The utility's Amanda Qithi explained that failure to implement load shedding by municipalities affects the stability of the national grid.

"Although Eskom notes the City of Ekurhuleni’s technical challenges in executing load shedding, it is left with no choice but to implement load shedding for the City of Ekurhuleni, as the non-compliance puts further strain on the already constrained national grid."

Read more
Similar news
This week's most popular news