Angola: Dalia Oil Field to Undergo Maintenance
The TotalEnergies-operated Dalia Field offshore Angola will undergo a planned 35-day maintenance period, resulting in lower cargo exports for March 2023.
Scheduled to begin on February 20, the maintenance program will consist of inspections of equipment, subsea lines and works relating to flare tips. Brought online in 2006, the Dalia Field is located in Block 17 – TotalEnergies “golden block” – and contributes more than 200,000 barrels per day (bpd) to Angola’s oil output.
Production at the field is tied back to the Dalia FPSO, which has a processing capacity of 240,000 bpd.
Other Reads
Other Reads
Grace Goodrich
Grace Goodrich is a Publications Editor at Energy Capital & Power, where she writes about the intersection of energy, policy and global finance in sub-Saharan Africa's fastest-growing economies. Grace produces our Africa Energy Series investment reports in Angola and Equatorial Guinea (2019), as well as co-authored African Energy Chamber: Road to Recovery (2021).
More from the Author
Sign up for latest news and event info